- Mission14:22
MST-11 completed the perimeter sweep of Chhari Dhand. No breaches, 3 fence anomalies logged.
142 ha · 38 min - Health14:09
KJ-4471 flagged: 17 kg lost over 14 days, lameness score 2. Drafted to the hospital paddock.
confidence 0.91 - Water13:54
Hodka bore trough at 21%, below the 25% threshold. Refill scheduled 16:30.
-4% over 6h - Mob13:31
418 head confirmed in Hodka Flat. Count variance -2 against the last muster.
MST-04 · thermal - Fleet13:12
MST-02 docked at the homestead pad. Charging to 80% in 24 min.
cycle 886 - Mission12:48
Autonomous muster Dhordo North to Bhirandiyara completed. 612 head moved.
2h 06m · saved ₹2,98,400 - Weather12:20
Wind gusting 22 kt from 020° after 16:00. The flight window narrows for MST-07.
IMD Bhuj - Health11:58
Weight gain across the Bhirandiyara mob is +0.86 kg/day, above target for a fourth week.
n = 1,240